A wonderful journey of fabric, from fabric to clothing processing process

2025-01-20

1.Raw materials: First of all, the garment factorysoperation process starts with the raw material cloth

Raw materials

2.Cloth inspection: The cloth transported from the Cloth Factory is placed in the warehouse and must go through the cloth inspection first

As for the inspection of cloth, each factory will have a standard. If the cloth exceeds this standard, the whole batch of cloth will be rejected or the cloth merchant will have to return work.

3.Fabric shrinkage:

After the fabric inspection, the quality-approved fabrics will be sent to the steam machine for airing and loosening to maintain the stability of the fabric area. For some special fabrics, if they are not air-dried for 72 hours and cut directly, the dimensional deviation will be significant. Generally, fabrics are laid flat for 24 hours. 4. Stretching:

After the OK of the pine, we first do"Computer Lab". You can crop it

5.Crop:

Crop

Thats itAutomatic cutting machine"

6.Sealing sample · Testing:

After the fabric is cut, there will be a department that is responsible for matching and checking whether there are any problems with the cut fabric. If there are any problems, they will be checked directly to facilitate the subsequent process

7.Tang Pu:

Inspection department: After inspection, some factories will have a middle heating department, which mainly heats some semi-finished products and some persimmons

Tang Pu

Thats itStove", the semi-finished product is in the process of being heated

8.Semi-finished product process:

If there are flowers on the car, they are generally sent to the car first, depending on the process. Some are sent out for bead ordering and embroidery, while some are sent out for bead ordering and embroidery after being sewn back. Everyone takes a general look at them

Semi-finished product process

Thats itComputer car flowers"

Computer car flower

9.make up ·"Tie bar":

A piece of clothing is ready with its pattern and the semi-finished product is also prepared, it can be sent to the workshop to start the sewing process. Nowadays, most round-neck T-shirts are directly sewn with elastic bands. This technique is crucial; if the seams are not evenly pulled, the collar will appear crooked. In such a case, when customers open the garment and see this issue, they would have no desire to purchase it.

10.Sewing"flatcar":

Sewing

This is the "flat car"

There seems to be nothing to say about this. The most ordinary car, which everyone should know, has some requirements for distance and number of needles when some work is more delicate.

11.Sewing"Tensioning car":

This is the "cannon car"

The scientific name is also called "stitching car", which is used in many places, the thread is chain sewing thread.

12.Sewing · roll collar, roll edge, fold edge, stretch seam:

stretch seam

This line is often used in knitteD Clothing such as rolled collar, rolled edge, folded edge, taut seam, joint seam and trim, etc., so lets see the effect of the clothes made by it.

13.Sewing"Locking machine":

Locking machine

This is the "lock edge machine", known as the bone cart in the south, which is used to prevent the spread of the edge of the cloth

14.New Eye:New Eye

Thats itOpen the door to the car"

15."Open the door to the car":

New Eye

Open the "new eye"

16.Button:

Push the button

Thats itPush the button"

17.Group inspection:

Group inspection

This is the "central investigation"

Each group should have a person in charge of checking shirts, and if there are quality problems, they can be directly improved.

18.Trimming the wire:

Trimming the wire

This is the "blower"

After checking the clothes, there is no problem with the shirt, cut the thread and send it to the blow line machine to blow off the thread.

19.Hot water:

After the threading is done, the front work is already considered complete, and the clothes are finished products, but this is not how to operate a garment factory? Of course not, after so many tasks, the clothes are definitely wrinkled. Entering the next process, ironing, the clothes need to be ironed flat and must also meet the customers size requirements, so generally after ironing the shirts, they need to be checked and measured.

Hot water

This is the "tail shop"

tail shop

20.Hang up the sign:

This is part of the "packaging workshop", with "hanging up the sign" and "sticking the certificate of conformity", etc., when all the clothes are guaranteed to have no quality problems, they will enter the packaging area, and all the quality problems should be improved from here.

21.Packaging:

After the finished garment is packed, it can be packed and shipped out

22.Completion of garments:

Finally, after the joint efforts of many people, the finished garment came to the sales market for sale. The entire Clothing Manufacturing process came to an end here, which was the wonderful journey of a piece of fabric.